Houses
Interiors
About
Contact
CZ
EN
BUILDING CHRONICLE SORT BY YEAR
vše
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
•
•
•
•
•
•
•
•
Foundations, foundation walls and basement
03.09.2008
more >
Beam structure of attic and roof
03.09.2008
more >
Brickwork on the first floor and visible steel - wooden flat roof construction
16.08.2008
more >
Beam construction of flooring and ground floor
06.08.2008
more >
Removal of formwork of the ceiling and reinforced concrete of the pool
01.08.2008
more >
Interior - Joinery and furniture
30.07.2008
more >
Baseboards and fireplace - stone tiles from Indonesia
29.07.2008
more >
The outer walls of limestone blocks VPA
10.07.2008
more >
08.07.2008
more >
Excavations and foundation footings
08.07.2008
more >
Reinforced concrete visible ceiling on the ground floor
01.07.2008
more >
Perimeter and the internal bearing walls on the ground floor
13.06.2008
more >
Start of construction
10.06.2008
more >
Waterproofing and reinforced concrete foundation slab
13.05.2008
more >
Terrace and pergola
05.05.2008
more >
Foundation walls
14.04.2008
more >
The foundation stone and geodetic marking out
16.03.2008
more >
Excavating
12.03.2008
more >
Closing house - roof, roof covering and windows
19.02.2008
more >
The foundation stone and geodesic marking out building
12.02.2008
more >
The first site visit
07.02.2008
more >
Wooden facade
13.10.2007
more >
Interior
03.10.2007
more >
Profession and house finishing equipment
20.09.2007
more >
CONTACT US
OUR HOUSES
OUR INTERIORS
UNDER-CONSTRUCTION
Houses
Interiors
About
Contact
EN
© 2001 - 2019:
TOMÁŠ KLANC
| graphic design:
LLEV
| PR:
IDEALAB